OUR PROJECTS
Dido Valley housing project
CLIENT
City of Cape Town
CONSTRUCTION VALUE
R56 million
PROJECT DESCRIPTION
The works in this contract include bulk earthworks for the formation of a suitable platform (including stormwater management structures (detention ponds)), Retaining structures, earthworks and layerworks for the construction of a surfaced road network (with kerbing and channelling). Also included is the provision of all internal civil infrastructure (sewer, water, stormwater etc) with erf connections for sewer and water (water connections individually metered).
Hazendal and Heideveld housing project
CLIENT
City of Cape Town
CONSTRUCTION VALUE
R150.0 million
PROJECT DESCRIPTION
As Lead Consultant on this project WEC-Consult was tasked with the rezoning to subdivisional areas and subdivision of the sites to allow for phased construction of 891 single dwelling residential erven, several portions of road, and public open spaces. This ran in parallel with the NEMA approval process. We were then tasked with the design, procurement and construction monitoring for the installation of basic engineering services. And finally as Principal Agent we ensured the successful construction of all 891 top structures.
Upgrading of Scottsdene Wastewater Treatment Works
CLIENT
City of Cape Town
CONSTRUCTION VALUE
R42 million
PROJECT DESCRIPTION
WEC-Consult Pty Ltd was appointed to increase the secondary-settling, inletworks and sludge handling capacities. The project included construction of a new 15 Mℓ/d ADWF inlet works, a new raw sewer pump station an emergency storage pond, two 28 m diameter secondary settling tanks and installation and commissioning of a new 100m3 per hour sludge dewatering press.
Southern extension of Van Der Stel Street
CLIENT
Drakenstein Municipality
CONSTRUCTION VALUE
R23.5 million
PROJECT DESCRIPTION
WEC-Consult was appointed to construct a dual carriageway (540m length) with two lanes in each direction, accompanied by the upgrading of the connecting intersections. Underground, the water distribution network was upgraded with the construction of watermains (560mm and 250mm HDPE) on either side of the road. Stormwater infrastructure was constructed to handle stormwater run-off for the new road.
Pedestrian Bridge in Wupperthal
CLIENT
Department of Rural Development
CONSTRUCTION VALUE
R5.8 million
PROJECT DESCRIPTION
WEC-Consult was appointed for the Construction of New Pedestrian Bridge and upgrade the existing walkways in Wupperthal.
Upgrading of Storm water and Road infrastructure in the Hessequa municipality
CLIENT
Hessequa Municipality
CONSTRUCTION VALUE
R95 million
PROJECT DESCRIPTION
WEC-Consult Pty Ltd was appointed for the design of flood damage repair work as well as the upgrading of road and stormwater infrastructure throughout the municipality.
Refurbishment and/or Upgrade of Existing Reverse Osmosis Water Treatment Plants
CLIENT
Matzikama Municipality
CONSTRUCTION VALUE
R3.0 million
PROJECT DESCRIPTION
WEC-Consult was appointed to refurbish the Bitterfontein Reverse Osmosis (RO) Water Treatment Works (WTW) and upgrade the existing Kliprand RO WTW to reduce the dissolved salt content of borehole water before being fed to the point of use.
Shell Service Station (SS) Canopies and other structural Designs
CLIENT
Pragma Africa (Pty) Ltd
CONSTRUCTION VALUE
Ranging between R1.2 million and R3.0 million
PROJECT DESCRIPTION
WEC-Consult is appointed as a “L3 Contractor” with Pragma Africa (Pty) Ltd and are regularly tasked to conduct Structural Integrity inspections on various Shell Service Station Canopies and other building structures across the country, that are followed by an appointment as the Structural Engineers to design a new Canopy Structure (or other structures) if required, including approval of the designs and final sign off at completion. WEC-Consult have been involved in the construction of the following canopies, amongst others: Oribi Toll Plaza Shell SS (Durban), Aboos Shell SS (Port Elizabeth), Sherwood Motors Shell SS (Port Elizabeth), Milton Motors Shell SS (Cape Town), Berkley Motors Shell SS (Cape Town), Kommetjie Shell SS (Cape Town), Marshalls Beach Shell SS (Fishhoek), Seamans Motors Shell SS (Graaff Reinet).
Service Station (SS) Fuel Systems Designs
CLIENT
Pragma Africa (Pty) Ltd
CONSTRUCTION VALUE
To be confirmed
PROJECT DESCRIPTION
WEC-Consult is appointed as a “L3 Contractor” with Pragma Africa (Pty) Ltd and have been tasked to complete Fuel Systems designs to the following service stations: Simon’s Town Shell SS, Airport Motors Shell SS and Kronendal Shell SS. WEC staff have completed various Fuels System related training courses presented by Pragma Africa (Pty) Ltd and their associates, including Franklin Fuels Systems competency certification.
New 5300m² Packing facility for AS Viljoen Farms in De Doorns
CLIENT
AS Viljoen Boerdery
CONSTRUCTION VALUE
R 35 million
PROJECT DESCRIPTION
WEC-Consult was appointed for the structural design as well as all civil related work on the new packing facility, we also did the project management to ensure the mechanical and cooling equipment is what the client required for this world class packing facility.
New 5600m² warehouse for Stellenbosch Vineyards in Stellenbosch
CLIENT
Stellenbosch Vineyards
CONSTRUCTION VALUE
R 30 million
PROJECT DESCRIPTION
WEC-Consult was appointed as structural and civil engineers for the construction of a new warehouse after the old warehouse was destroyed in a fire. The new warehouse is used for wines storage and also serves as a distribution facility.
Upgrading of Langebaan Wastewater Treatment Works
CLIENT
Saldanha Bay Municipality
CONSTRUCTION VALUE
R 40 million
PROJECT DESCRIPTION
WEC-Consult Pty Ltd was appointed to increase the treatment capacity of the works from 1.0 to 3.5 Mℓ/d. The upgrade was implemented in an engineered phasing approach to suit funding availability. Phase 2 of the works have been completed with phase 3 construction to commence shortly. Upgrades so far have included a new 3.5 Mℓ/d reactor, a new 7 Mℓ/d inletworks, extension to the control building, new RAS pump station, new sludge drying beds, new chlorine contact channel and new 20m dia clarifier.
New 7ML reservoir as well as upgrading of existing pump station and pumping main
CLIENT
Stellenbosch Municipality
CONSTRUCTION VALUE
R 25 million
PROJECT DESCRIPTION
WEC-Consult was appointed for the structural and civil design of a new 7ML reservoir and construction of new 400mm diameter pumping main. The upgrade and installation of new pumps along with new MCC and chlorination system for the upgraded pump station.